Detail design only for surface works for the CVO for Stage 1 (ball mill and tailings thickener);
- Stage 2 (secondary crushing and screening);
- Stage 3 (flotation);
- Stage 4 (high pressure grinding roll and concentrate pumping);
- Newcrest have selected Fluor Australia as PCM Contractor (design includes infrastructure works) with SKM (underground design works) and Ausenco (aboveground design works).
- Project
- Cadia East Project
- Location
- Cadia Valley Operations, Orange, New South Wales
- Client
- Newcrest Mining Limited
- Project Type
- Resources
- Year Completed
- 2011